2024 Road Projects

     TRIS PROJECT - SAND ROAD

        SMA

        Publicatin Affidavit

        DOT Grant Final

        Project Summary

      LRIP Award Letter

        Monarch Bid

        Stout Construction Bid

        Minutes from Special Meeting - Award   

   

2023 Road Projects

Swiss Chalet Road (LRIP Project)

Swiss Chalet is one of the oldest roadways in the township (surface age) with sigificant deterioration. This roadway also had significant vehicular counts per day.  This section of roadway was pulverized and re-paved in May of 2023 with a portion of the funding through the WisDOT LRIP program.

2023 Cadle Road Flooding

Cadle Road experienced some flooding in the Spring of 2023 that casued some serious issues with culverts on this section of roadway.  There will be funding applied for to replace these culverts

2021

About 2,000 feet of Hilltop Rd continues to deteriorate largely because of high water in the wetlands on each side. The shoulders are sinking and the blacktop breaking up in addition to the flooding of about 400 ft following snow melt or heavy rains. Beaver compound the problem when they continue to plug the culverts. In November an excavator was brought in to remove all the brush, mud and other debris in hopes of mitigating problems next spring.

Town of Bashaw

Town of Bashaw

Sawyer Creek Road

A major project for Bashaw this summer was completion of the blacktopping project on Sawyer Creek Road. The project began a year ago when soft spots were dug out and filled with gravel. Following that 4-6 inches of new gravel was put down and the entire road bed was ground up, graded out and left to compact over winter. The blacktop was put down this spring..